Inflow and Infiltration Mitigation – City of Dunlap, TN

In this video, you can see the severe inflow and infiltration occurring at the connecting lateral line. We injected the URETEK 486Star along the perimeter of the lateral line to stop the intruding groundwater into the pump station. The estimated inflow was over 100GPP. We stopped the inflow in less than 2 minutes.