Valencia Lakes Roadway Stabilization – Wimauma FL

 

Project Challenges Solution Support Outcome
•Failed joints at manhole and lateral lines caused roadway settlement in a private community
•Identify all failed joints and cracks in pipe and laterals
•Worked with local GHD Engineering
•Communication with GL Homes
•Plan coordinated with GHD Engineering to develop injection plan for pipe and soil stabilization
•GL Homes
•GHD Engineers
•Ground Works experienced crew
•Work completed in 5 hours from site visit to completion
•Approximately 550 Sf of soil stabilized to a depth of -12’on either side of pipe
•Monitoring at surface to confirm soil stabilization.
• Post injection tested confirmed area stabilized