Valencia Lakes Roadway Stabilization – Wimauma FL

Project Challenges | Solution | Support | Outcome |
•Failed joints at manhole and lateral lines caused roadway settlement in a private community
•Identify all failed joints and cracks in pipe and laterals
|
•Worked with local GHD Engineering
•Communication with GL Homes
•Plan coordinated with GHD Engineering to develop injection plan for pipe and soil stabilization
|
•GL Homes
•GHD Engineers
•Ground Works experienced crew
|
•Work completed in 5 hours from site visit to completion
•Approximately 550 Sf of soil stabilized to a depth of -12’on either side of pipe
•Monitoring at surface to confirm soil stabilization.
• Post injection tested confirmed area stabilized
|