Pool Deck Stabilization – Longwood, FL

Project Challenges Solution Support

Outcome

  • Unknown size of void
  • Design of injection plan to minimize material, yet fill void area
  • Confine material to void area
  • Design injection plan to confine material by “building” a wall
  • Surface monitoring to track surface reactions
  • Marbeya Condo association and Board of Directors
  • GEO Engineering Services
  • Project completed  in one day
  • Project completed under estimate
  • Additional area were stabilize to prevent future trips