ORNL – CSB-110 Renovation

Contractor was able to complete excavation with only minimal slab demolition, and without undermining or destabilizing the slabs that were left.
Contractor was able to complete excavation with only minimal slab demolition, and without undermining or destabilizing the slabs that were left.