72” RCP Dam Outfall Pipe Repair

Project was more cost effective than remove/relay and bringing in additional fill material. Also, slip lining was not a viable option since the water was coming from the outside of the pipe.
Project was more cost effective than remove/relay and bringing in additional fill material. Also, slip lining was not a viable option since the water was coming from the outside of the pipe.