Project completed in 6 hours
Customer Satisfaction: stabilized and filled voids under budget to standards that helped exceed customer expectations.
Close laser monitoring resulted the positive completion of the desired void fill and floor stabilization.
Bearing capacities in some locations were increased to well over 8,000psf, greatly exceeding specifications.
Depth injections were placed in specific areas determined by client to allow for heavier equipment loads
The tunnel leaks are sealed against ground water infiltration.
No Service disruption
Floor brought back into proper alignment.
GWS rehabilitated the Rail Bed soils while rail cars were actively being loaded!
Stabilization of the perimeter footing and grouting of the existing storm line provided a permanent solution in combination with slab lifting
Some building foundations were also stabilized during the mobilization.
A completely satisfied Owner!